Kiliwani
Kiliwani North tested at 40MMcfg/day from Kiliwani North
pool only 2km from the new Songo Songo gas plant and pipeline for Dar es Salaam
Production maintained over previous quarter to a
satisfactory level at a slightly lower rate to accommodate temporary
restriction at the Government owned gas plant
In July 2017, it was planned to shut down for at least 15 days for maintenance during which time the joint venture will conduct pressure tests at the well.
Nyuni
During the year to 30th June 2017 Bounty
increased its interest in Nyuni PSA to 10% increasing their “participation in
one of the most dynamic and successful new exploration plays worldwide.”
Operator Aminex PLC, is negotiating a work program
variation with TPDC to enable deep water the acquisition of deep water 3D
seismic in the outboard sector of the PSA area and deferral of the two
exploration well drilling commitment.
Once the variation to work commitment licence has been
granted, a re-tender process is planned to select the 3D seismic contractor
capable of acquiring high resolution 3D over key Pande West lead in 2017 and to
identify other potential prospects in the deep water with a view to bringing
them to drill ready status.
There are numerous other deep water channel/fan features
with associated seismic anomalies apparent in the Nyuni block from the limited
seismic coverage available. The exploration
licence is in good standing. Bounty has
also commenced steps to acquire additional gas interests in Tanzania
Source: Bounty Oil and Gas