Thursday, 18 October 2018

Aminex_PLC Reasons to be Cheerful


Farm Out and EGM (Date reconfirmed three times) to take place by End November. Being subject to licence approval infers the EGM RNS will be the big one and need to be within next few weeks

“Multiple Targets - 763bcf cretaceous 900bcf Jurassic Gas assumed at lower but liquid potential - Oil shows found down dip previous drill”

4.858 TCF GIIP - for Ruvuma - Ntorya 1.9TCF GIIP - 368 BCF 1C - 763 BCF 2C & 1162 BCF 3C

io commercial study est. $143m spend to recover 3/4 tcf based on current gas price, $3.27/mcf is worth $25m to $35m cashflow per annum to Aminex from 2020 to 2049” "Fully covered"

FARM OUT - APT committed spend up to $110milion + 35m from Solo on FFD of Ruvuma project which includes a committed spending of $40million to Aminex. $5m cash & balance $35million paid as full carry up to 40MMscf/d at which point any unspent remainder will be paid in cash from gas profits.

APT to acquire 50% of the Ruvuma project with Aminex retaining 25%. Solo Oil hold remaining 25%

“APT will establish an early production system to achieve an accelerated first gas to a MINIMUM gross rate of 40MMscf/d by Qtr1 2020” representing full carry to minimum $10 to $12m p.a. cashflow “Not revenue – Free Cash”

"Much more expected! Not worth building a 30Km pipeline for just 40MMscf/d"

"Any further spending will be self-generated"

**“Chikumbi-1 well pad is complete - planning to drill this year” Rig tender complete Negotiating with two chosen suplliers

Based on results of CH1 will build a 33km pipeline to Mdimba gas plant to allow for maximum gas delivery “planned for 2019”

“Q1 2020 Monetisation to coincide with demand call”

“Plan” Drill CH1 alongside 3D & back with further 3 to 4 drills (possibly 2019)

FFD is projected to 140mmcfd by mid-2020’s

**KILIWANI REMEDIATION WORK UNDERWAY - FURTHER PERFORATION OF LOWER LEVEL EXPECTED COMPLETE BY CHRISTMAS https://www.youtube.com/watch?v=QQhhGwR4TZo

**Aim to bring drill ready target at Kiliwani South via 3D Seismic 2019 combining Nyuni licences to save costs & provide better Data Quality & Use.

Competitors running maximum capacity & demand forecast to outstrip supply 2019

**TPDC AGREEMENT SIGNED FOR PIPELINE CONSTRUCTION TO UGANDA (Aminex in pole position to supply)

**SADC nations agreed to develop plan to allow gas imports from Tanzania, Mozambique & Namibia

Malcy Comments “Bucket list status assured.” "The value of this asset is high!"